nickel and cobalt mine dry tonnes wet tonnes

    Nickel-cobalt laterites in the news MINING.COM

    6/10/2020· An operating demonstration plant has leached 8,000 tonnes of ore in full-height heaps and has achieved first sales of nickel and cobalt products.This will allow them to expand the existing

    Chat Online

QUARTER ENDING 31 MARCH 2020 MT THIRSTY COBALT NICKEL

The operating cost estimate is $65.32 per dry tonne at the process design criteria grades, but will vary over the life of mine with reagent consumption tied to feed grades. The All-In Sustaining Cost is A$35,400 per tonne of contained cobalt metal after adjusting for Nickel credits and payability discounts.

Chat Online

For personal use only ASX

The PFS is based on the 26.9 Mdt @ 0.117% cobalt and 0.52% nickel Indicated and Inferred Mineral Resource (Table 1) and allowed a Maiden Probable Ore Reserve of 18.8 Mdt @ 0.126% cobalt and 0.54% nickel to be estimated (Table 2). Table 1: 2019 Mineral Resource estimates (all grades reported on a dry basis). Mineral Resource Cut-off (Co%) Wet Tonnes

Chat Online

Goro mine Wikipedia

The 370 million tonnes of ore contains 5.92 million tonnes of nickel metal. The Goro mine is targeted to produce about 40,000 tonnes of nickel per year, and also some cobalt from saprolite deposits. It was designed by the Canadian company Inco, and completed by the Brazilian company Vale after it purchased Inco. Ore comes from a huge open cut mine on the Plaine des Lacs. Nickel and cobalt

Chat OnlineCompany: Vale, sale to New Century Mining in

Cobalt Department for Energy and Mining

The world class Wingellina lateritic nickel-cobalt-iron deposit a few kilometres to the west in Western Australia has a resource of 187 Mtonne at 0.08% Co for 14,960 tonne cobalt (also 1% Ni, 47% Fe). Gawler Craton and Stuart Shelf. South Australia’s total recorded production of cobalt is ~2900 t as a by-product from the Mount Gunson Copper Mine. Between 1974 and 1986, the mine produced 290 000 t

Chat Online

RANKED: World's top 10 nickel projects MINING.COM

17/3/2021· DeepGreen’s portfolio also includes the TOML exploration zone with estimated wet nodule resources of just under 954,000 tonnes contained nickel and with similar grades to

Chat Online

ALTA MetBytes Nickel-Cobalt Laterites in the News

demonstration plant has leached 8,000 tonnes of ore in full-height heaps and has achieved first sales of nickel and cobalt products.(9) This will allow them to expand the existing demonstration plant by a factor of 10 to 1,400 tpa nickel to jump-start the project to immediate producer status without the need for a BFS.(11) Process Innovations

Chat Online

Mt Margaret Nickel-Cobalt Project

The proposal is for a large-scale nickel and cobalt mining and processing operation in the north-eastern goldfields of WA. The proposal will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south

Chat Online

Goro mine Wikipedia

The 370 million tonnes of ore contains 5.92 million tonnes of nickel metal. The Goro mine is targeted to produce about 40,000 tonnes of nickel per year, and also some cobalt from saprolite deposits. It was designed by the Canadian company Inco, and completed by the Brazilian company Vale after it purchased Inco. Ore comes from a huge open cut mine on the Plaine des Lacs. Nickel and cobalt

Chat Online

EPA Western Australia Environmental Protection Authority

16/9/2020· The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of

Chat Online

RANKED: World's top 10 nickel projects MINING.COM

17/3/2021· DeepGreen’s portfolio also includes the TOML exploration zone with estimated wet nodule resources of just under 954,000 tonnes contained nickel and with similar grades to

Chat Online

Cobalt Department for Energy and Mining

Exploration in 2007 identified cobalt, with a resource identified in 2010 of 13.1 Mtonne at 0.14% Co for 17,500 tonne contained cobalt metal (also 0.23 g/t Au, 1.48% Cu and 20% S). The Ethiudna Mine was worked for copper–cobalt–nickel mineralisation from 1889 to 1908 and reopened for a short period in 1914 when it was renamed the New Year

Chat Online

Mt Thirsty PFS outlines counter-cyclical opportunity

The PFS includes maiden reserves of 26 million wet tonnes grading 0.126% cobalt and 0.54% nickel. The project should produce 19,100t of cobalt and 24,800t of nickel in 9530tpa of a mixed sulphide product over 12 years of mine life, and deliver a post-tax net present value of A$25.7 million, the 18-month long PFS concluded.

Chat Online

For personal use only

resource of 180 million dry tonnes at 1.3% Ni and 0.08% Co, containing 2.3 million tonnes of contained nickel and 140,000 tonnes of contained cobalt. Hengjaya Mine (80% interest held by Nickel Mines) Overview The Company holds an 80% interest in PT Hengjaya Mineralindo, the owner of 100% of the Hengjaya Mine, with the remaining 20%

Chat Online

Nickel Mines Fasttrack Debt Repayment Ove Kalkine

28/3/2021· During the period, the prospect produced a total of 212,568 wet metric tonnes of nickel ore with an average stripping ratio of 2.2. The Company managed to sell 209,628 wet metric tonnes during the period at an average grade of 1.81 per cent of nickel.

Chat Online

Our Operations Ravensthorpe Nickel Operation

Ravensthorpe processes nickel laterite ore extracted through open-cut mining. To achieve this we use a high-pressure acid leach process that results in a mixed hydroxide product for export. Our product contains about 40 per cent nickel and 1.4 per cent cobalt on a dry basis. Waste heat from the process is recovered to produce steam via three

Chat Online

Pure Minerals takes step towards Australian Mining

Pure Minerals’ newly-acquired Queensland Pacific Metals (QPM) has obtained permission to use Direct Nickel Projects (DNP)’s nickel and cobalt processing method. QPM will apply the DNi process

Chat Online

Last News

ZhengZhou N-CAI Corporation © 2020 Copyright.Crusher